I am a convert from Proshow Producer and have a basic question. I've searched through all the helps and watched Barry's videos...
Is there a way to lock slide durations so that the entire timeline shifts on certain actions? For example:
1. If I insert a slide into the middle of a timeline, the new slide seems to steal time from another slide instead of lengthening the timeline to contain the new slide (maybe with a default duration).
2. If I shorten the duration of a slide, it lengthens the next slide's duration.
Is there a way to ensure that slides durations aren't changed?
I hope this makes sense.
Thanks,
Brad