Jump to content
WnSoft Forums

Brad

Advanced Members
  • Posts

    27
  • Joined

  • Last visited

Posts posted by Brad

  1. I am a convert from Proshow Producer and have a basic question.  I've searched through all the helps and watched Barry's videos...

    Is there a way to lock slide durations so that the entire timeline shifts on certain actions?  For example:

    1. If I insert a slide into the middle of a timeline, the new slide seems to steal time from another slide instead of lengthening the timeline to contain the new slide (maybe with a default duration).

    2. If I shorten the duration of a slide, it lengthens the next slide's duration.

    Is there a way to ensure that slides durations aren't changed?

     

    I hope this makes sense.

    Thanks,

    Brad

×
×
  • Create New...