-
Posts
9,295 -
Joined
-
Days Won
56
Everything posted by davegee
-
Igor, The following test is repeatable on both my Vista and W7 PCs in V7.0.7 and V7.5.3 and results in the anomaly seen below. Open a NEW PROJECT. Set KFSD on and Slide Duration and Transition Time to 8 seconds and 2 seconds respectively. Add 3 Blank Slides. Open Slide 2 (or 1) in O&A and add an object. Set KFs at 2 second intervals i.e 6, 8 10, 12 and 14 seconds. Go to Customize Slide. Tick Scale KFs and adjust Slide Duration to 16 seconds. The result is shown below. The penultimate slide is not Scaled? Either my understanding of Scale Key Frames is flawed or there is a Bug / Logic Problem there somewhere?? DG
-
Gary/ Stu, The following test is repeatable on both my Vista and W7 PCs and results in the anomaly seen in Post#40. Open a NEW PROJECT. Set KFSD on and Slide Duration and Transition Time to 8 seconds and 2 seconds respectively. Add 3 Blank Slides. Open Slide 2 in O&A. Set KFs at 2 second intervals i.e 6, 8 10, 12 and 14 seconds. Go to Customize Slide. Tick Scale KFs and adjust Slide Duration to 16 seconds. The result is shown below. Either my understanding of Scale Key Frames is flawed or there is a Bug / Logic Problem there somewhere?? DG
-
I will check again in morning but got that result at least twice. DG
-
OK. Now what about post # 40? DG
-
Short example? MediaFire - Dropbox etc? DG
-
Stu / Gary, The plot thickens!! While trying to make an example for Gary I found that this happened - bottom half is before Adjustment - Top half is after Adjustment. Three out of four correct is not Bad?? DG
-
Gary, Try some tests where you have the last Key Frame at the END of the Slide Duration in both KFSD and Non-KFSD. The penultimate and Last Key Frames can have EXACTLY the same settings and will not affect the overall appearance but might throw some light on what is happening. See my reply to Stu. I think that there is a valid reason to ask Igor to confirm or otherwise that FSD is always used when calculating Key Frame adjustments with Scale Key Frames ticked. If he confirms that KFSD is always used, I'm happy with that and understand the maths but I really think that the calculations should be different for Non-KFSD and KFSD Modes. DG
-
Hi Stu, I thought that I was the only one using KFSD exclusively and have been doing so since it was firtst introduced. I totally agree with you on what we are seeing with the Scale Key Frames and KFSD. That is not the confusion and I understand exactly the math involved. What I am not sure about is the apparent confusion which might be caused when Scale Key Frames is used in a Non-KFSD Mode? Is the relationship between Scale Key Frames and FSD the only option? Should there be a different option when Scale Key Frames is used in a Non-KFSD Mode? My thinking is that 100% (time) should be different for the two modes. It is bound to be confusing to have a Key Frame set at the beginning of the incoming transition (Slide Duration) in Non-KFSD suddenly jump to the END of the incoming transition when an adjustment is made to the time and Scale Key Frames is ticked? The difficulty for Igor is sure to be how to handle Key Frames which are set to e.g. 120% of Slide Duration in Non KFSD Mode. I can see both sides of the argument but my gut feeling is that a Key Frame placed at 100% of Slide Duration in Non-KFSD should be at 100% of Slide Duration after a time adjustment with Scale Key Frames Ticked. A difficult one? If you want graphical representation of what I am talking about I can do that. DG
-
Agreed, but I am only looking at the LAST Key Frame and it matters not if KFSD is set or not for that KF. It will always be at the end. If you introduce a transition then the results differ according to the KFSD setting and where the Last KF is placed. DG
-
Hi Stu, Not arguing with your findings. Just wondering if the results SHOULD be different depending on the KFSD setting? DG
-
The complication in understanding what is happening is compounded by the fact that Gary has (apparently) set a keyframe outside of the Slide Duration in a Non-KFSD mode project. Gary please correct me if I'm wrong? The test I refered to above: Non-KFSD Mode; Slide Duration 8 secs; Keyframes at Zero and 8 Seconds. When changing the Slide Duration to 16 seconds with Scale Keyframes Ticked I would expect that the second Keyframe be placed at 16 seconds in the same physical position at the beginning of the incoming transition (because I am in Non KFSD Mode). This, to me would be logical. However, it appears to me that when Scale Keyframes is selected the calculation is made on the basis of KFSD being set. Surely this is Logically wrong and the basis of the calculation should take into account KFSD or Non-KFSD? For example the 8 second keyframe in the above example would be 100% of the slide duration based on Non-KFSD before and after the Slide Duration change. Take a similar example with KFSD set to ON. KFSD Mode; Slide Duration 10 seconds; Keyframes at zero and 8 seconds. After a change of Slide Duration to 16 seconds the last Keyframe is now set to 16 seconds - the END of the incoming transition. Stu is correct that when Scale Key Frames is used the last Key Frame is always set to 100% of FSD and the others scaled to suit. However I don't see this as being Logical - KFSD or Non-KFSD should be taken into account. DG
-
Gary, Stu, There is something not quite right here. Try some tests with KFSD off and Keyframes contained within the Slide Duration i.e. not overlapping into the incoming transition time. The results cannot be right?? DG
-
Fun? Sure is!! I have concentrated recently on dispensing with the need (or desire) to use Masks. There are, of course, times when the mask will always be needed but there also times when I have used the mask as a first preference and whilst my "new" desktop will handle everything thrown at it the same project almost refuses to run on a lesser machine. So, no more masks unless there is absolutely no other way!! Anyway, back to the discussion arising out of Gary's suggestion..... DG
-
Hi Lin, I'm fully aware of what's available and I suggested something a little different back in September of last year having encountered a set of circumstances for which the present arrangements are cumbersome. The Master / Slave arrangement would allow for movement of a "block" of Keyframes by clicking on the Master Keyframe and dragging one way or the other moving both the Master and all slaves at the same time by the same amount. This facility is not presently offered? So with regard to my suggestion the method that you offered most definitely IS a workaround? (IMHO & from my perspective).B)/> DG
-
Hi Lin, Does your workaround allow for Clicking on a single "Absolute" keyframe and dragging it and "x" number of "Relative" keyframes all at the same time and by the same amount? DG P.S. Absolute and Relative are my terminology - they could be called Master and Slave.
-
DG
-
Hi Colin, I think that you need to open your music file up in your Audio Editor and resave - making sure that it is saved CBR (Constant Bit Rate)? I opened it in Audition and it was 38 seconds - I saved it as a 160 KBPS CBR MP3 at 44100 and inserted it into the project. The new time was 41 seconds and I had to alter the slide positions a little. After that the sync was perfect from any position in the show. DG
-
The last two are the same thing (??). I just played the iPad4 MPEG4 on my TV (via USB) and there is no difference (that I can see) between it and the version created via the HD Video Option. By the way, you cannot create a 2048 MPEG4 for the iPad - you use 1920x1080 and put up with the (slight) upscaling. Once again I'd be delighted to hear from anyone who can show me otherwise? For JPEGs 2048x1536 works GREAT (iPad4) but for Video - no. DG
-
Correct Barry, As a trial I just converted my current project for which the EXE is 30Mb to MPEG4 using Igor's iPad4 Preset at Highest Quality and the resulting file is 322Mb. Reducing the quality setting to 50% gives a much smaller file so I suppose the way forward would be to find a quality setting for the iPad 4 which gives the smallest file at a quality which is better than a 1024 file upscaled? I think that Igor's presets are only to set the correct resolution and that an iPad 4 file at 1920x1080 will still play on an iPad 2. The reverse is also true but the upscaling is what "worries" me. I can judge for myself what is acceptable but I can't put myself in someone else's shoes to judge what their perceptions of the upscaling or quality settings are. If in doubt go for the highest quality? DG
-
Mark / Barry, 1024x576 is not going be as good on an iPad 4. Try it? You might think it's acceptable but I can see quality issues. I have yet to find a way of getting video to play at actual pixels on the iPad 4 so your 1024 wide becomes 2048 wide. Putting the 1024 wide on a 2048 "carrier" is one way forward unless someone else knows of a way to play at actual pixels? DG
-
Create a free account at DropBox or post at Media Fire and let us download the larger project which shows the problem. Describe the problem as accurately as you can and tell us what you think is out of sync? https://www.dropbox.com/plans http://www.mediafire.com/ I'm not a big fan of mediafire because of the suspicious adverts. DG
-
Just put one image up which displays the problem and let us try it out in PTE and PS etc.? DG
-
Colin, Do you have Synchronise Sound Track etc ticked in Project Options Advanced? DG
-
Colin, How big is your attachment - there is a limit? If it fits the bill then go to Full Editor - Click to Attach Files and when the file is uploaded click on the Add to Post on the right. DG