-
Posts
13,573 -
Joined
-
Last visited
-
Days Won
255
Everything posted by Igor
-
Hi, We're planning a major improvement to a text object before the final release of version 12.0. I just want to make sure the new code works as intended before announcing it. Regarding the issue of keeping consistent text size between slides. I understand this task. But how can we implement this, if the text size depends on where the text object is added - on a slide or as a child object? Years ago we've added one solution (which, of course, isn't suitable for all cases) - a text comment. The text object has a special mode - text comment. And its size can be controlled through the Project Options (for all slides or for new slides) in the Pro version of PTE AV Studio.
-
When you save a project, it saves unused material
Igor replied to SoCu's topic in PTE AV Studio 12 Beta
Re-open this project (or restart PTE AV Studio), and the program will remove unused resources associated with this project. This works this way, because user can undo changes (Ctrl+Z) and return some transition with video resources to the project. Therefore, clearing unused resources always occurs when closing the program or closing the project (re-opening the project). -
Hi, That's a good idea, thanks. But in the future V13, we plan to add multiple slide tracks, which will allow the logo to be displayed with better flexibility and customization. An universal tool would better than specialized tool.
-
Hi Mark, JPEG-XL support is in our plans, not sure about V12. Do you have a lot of these images or only a few? Interesting fact: JPEG format is much better suited for PTE AV Studio because it includes amazing optimization. When displaying a reduced size version of an image, such as thumbnails for the Slide List, images for a mini-player, or fullscreen previews/EXE show on a low-resolution monitor (1920x1080), the JPEG decoder loads the image in 3-4x times faster than a fullsize image. It works only for classical JPEG.
-
I really like the idea of multiple slide/object tracks. We've already written some of the code. One of the most important ideological questions is slide duration and transition duration. You can already see (V11) the difference in the timing concept for slides and audio clips - they are calculated differently. I'd like to discuss this topic after the release of V12.
-
That's a good idea. Let me think about it.
-
Bruno, thanks for checking!
-
Thanks, Bruno! Can you also check this new function: Quick Search is now accent-insensitive: typing "a" will match both "a" and "à"
-
Master & Linked Videos Can Not be Copied - In PTE11 also [SOLVED]
Igor replied to jkb's topic in PTE AV Studio 12 Beta
Hi Jill, thanks for checking! -
Master & Linked Videos Can Not be Copied - In PTE11 also [SOLVED]
Igor replied to jkb's topic in PTE AV Studio 12 Beta
Hi Alex, I'm glad, thanks for the confirmation! -
Glad that you like this new function! I just updated a text description in the 1st above above and added a new screenshot.
-
Try Beta 7. Quick Search now includes a filter for the number of images required by slide styles.
-
Try new Beta 7. Quick Search is now accent-insensitive: typing "a" will match both "a" and "à", for example. It works in Project Options, Slide Options, and Styles and Themes.
-
Master & Linked Videos Can Not be Copied - In PTE11 also [SOLVED]
Igor replied to jkb's topic in PTE AV Studio 12 Beta
Jill, please try new Beta 7. -
Beta 7 is available See the download links above. Improved the Trim and Adjust speed window (for a video object). Added scrollbar for the timeline. Quick Search now includes a filter for the number of images required by slide styles. Quick Search is now accent-insensitive: typing "a" will match both "a" and "à" - great for non-English style names. It works in Project Options, Slide Options, and Styles and Themes. Fixed an issue with copying slides with Master video track objects. Fixed an issue with not working Safe executable for PC option in the Publish menu.
-
Hi, Let me answer a little later.
-
Master & Linked Videos Can Not be Copied - In PTE11 also [SOLVED]
Igor replied to jkb's topic in PTE AV Studio 12 Beta
Jill, we fixed this issue. Beta 7 will be ready in 1-3 days. -
We've improved the Quick search function for the next Beta 7 (in several days). It will search for accented and unaccented letters.
-
Master & Linked Videos Can Not be Copied - In PTE11 also [SOLVED]
Igor replied to jkb's topic in PTE AV Studio 12 Beta
Hi Jill, Thanks for your message! I confirm the issue with Master/linked video objects. In V12 it is NOT possible to copy and paste a slide which contains a Master video / Linked video object. If I start a new project in V11, create a series of slides with Master/video objects, these slides are being copied/pasted correctly. Please wait when we fix this problem for V12. I'll try to do it quickly. -
Updated version of PTE AV Studio 11.0.21 is available for PC and Mac Download: https://www.wnsoft.com/pte-av-studio/download/ Added full support for dead keys (^, `, ´, ¨, ~) on international keyboard layouts - French, Spanish, German, Portuguese, Italian, Dutch, and others (Mac) Improved Spanish localization. About window shows: 11.0.21 Build 2. Windows users can skip this update.
-
Yes, I'd like to get a copy of the transitions folder to check what is broken there.
-
Changing the speed of a video is broken in several ways [SOLVED]
Igor replied to mhwarner's topic in PTE AV Studio 12 Beta
Yes, I understand this issue. -
Hi, I just checked - created a new custom transition with a video mask in V11 and then opened it in V12 Beta 6 - the transition worked fine. Please let me know, did you test this particular transition in the previous Beta 5? If the transition was created earlier (in V11), check its work in V11. Also you can send us the all storage of custom transitions for checking. Send me a personal message with a download link. Usually custom transitations are located in a folder: Documents > PicturesToExe > Styles and Transitions > Transitions
-
Changing the speed of a video is broken in several ways [SOLVED]
Igor replied to mhwarner's topic in PTE AV Studio 12 Beta
Most likely, playing 4K 60p video at double speed in the preview was already pushing the limits of the PTE and your computer. In V12, we completely rewrote the video playback code (the algorithm for loading and displaying frames) to improve smoothness and to support smoother playback of variable refresh rate videos (these video files are becoming more common now - from new iPhones). I think the right solution would be use of proxy video for real time previews. We're already considering it. -
Hi, Yes, we plan to add this filter for the Quick search function in V12.